Friday, March 22, 2019

March 22 Update

Design Committee had its first meeting. The team collaborated on possible designs that would include retention of the existing gym. DOWA-IBI (architects) facilitated the meeting and provided lots of time for the 26 people in attendance to experiment with different configurations for the new school. No decisions have been made at this point. DOWA-IBI is working to develop some preliminary drawings that the team will evaluate on Thursday, March 28 at 6 p.m. at THS. We'll also get some idea of costs for these designs.


This is a photo of Bud Hawk Elementary in Bremerton. Community members loved this look during the January visioning session.

Surveyors have been "decorating" the campus with flags. They're making measurements to plot the topography of the site. This process is expected to take two weeks. Geotechnical engineers will be drilling near the front of the school on Monday to sample soils and assess the current foundation of the building. The historical consultant is continuing her work to assess the architectural historical significance of the building.

You can see photos and notes from Monday's meeting.

I presented at the Big Community Meeting on Mar 21. You can see my presentation here.

If you're interested in participating in the design of the new school, there is still time to commit to the team. We estimate that it will require about 8 hours per month through October (including the summer months). If that doesn't scare you and you want to help design the best school possible with the resources available, we'll see you on Thursday!

Please share the link to this page with others so that everyone can follow our progress.